Cooling Tower & Chiller required [Pakistan]
We require the cooling tower and chillers details are given below.
Cooling Tower: Total load 3 million k cal/s which more or less corresponds to 1000 refrigerating ton. you can consider a pre-assembled cooling tower consisting of 2 ot 3 modules.
Requirements:
•1 cooling tower with 1000 on cooling capacity
•3 pumps with 130 - 140 m3/h flow rate and 35m head delivering the cooling tower to all users and back to cooling tower, except the evaporator.
•2 pumps with 130 - 140 m3/h flow rate and 35m head back to cooling tower from evaporator.
•1 basin supporting the cooling tower, same base area of the cooling tower, 3 m deep
•Control Panel.
Chiller:
The total load of the chiller is about 30,000k cal/h otr 10 ton and you can consider:
•1 air cooled chiller with 10 ton cooling capacity and one chilled water delivery pump 6m 3/h flow rate and 35 m head.
•2 pits 1.5 * 1.5 * 1.5m collecting return chilled water from vacuum pumps.
•Two plate heat exchanger for 3m 3/h and water from vacuum pumps.
•Two temperature control units.
•Control panel.
Awaiting for your immediate response and qoutation from relaible suppliers. Port is Karachi - Pakistan.
Regards,
Salman M. Yousuf
Contact Person: Mr. Salman Yousuf
Company Name: Mavapil
Street Address: Chagla street, Tower
City: Karachi
Province/State: Sindh
Country/Region: Pakistan
Zip: 74400
Telephone: 92-331-8605310
Fax: 92
Website: http://www.mavapil.com
手机链接:http://m.vooec.com/global_60492.html
网站链接:http://www.vooec.com/global/60492.html